My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61856
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:22 PM
Creation date
11/20/2007 7:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998058
IBM Index Class Name
Permit File
Doc Date
10/30/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - HS'DRAULIC E%CAVATOR WORK <br />Task p: 3 Prep. by: ESC Task File Name: M05 R-3 <br />____________ _______"_ ____"""""____ <br />Da [e: 10/30/98 Permit p:M-9B-OSB Mine: Tellier Gravel Pi[ <br />____"_______ _________ _________________________________ <br />Pe rmi[ Action: New 112 Permit Application <br />Task Description: Reclaim 1/2 Haul Road w/ Rackhoe <br />_______"""_____________________________________________"_____ <br />HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 307 ShrEt Dasis:l/day <br />Cost Brea own: <br />_______"___________ <br />_"_______ <br />~~~~~~~~~~~~ Utilization k Horsepower 59 <br />ownership cost/hr = 58 .83 N/A "°°"""" <br />Operating fi overhaul cost/hr= $8 .95 100 Weight-tons: <br />Operator cost/hr = $23 .12 N/A ------"- <br /> _____ ___ IDQI robin) <br />To Cal egpt. unit cost/hr = $40. 90 Total fleet cos[/h r: $40.90 <br />MATERIAL QUANTITIES <br />Initial Swell LOOSe <br />Volume: 2,000.0 LCY Factor: N/A Volume: 2,000.0 cu. yds. <br />____________ __________ _______"_____ <br />Source of quantity take-off: Opera [or estimate <br />___________________________________________________ <br />Source of est. swell factor: N/A <br />HOURLY PRODUCTION <br />Cycle Time - Basic cycle time Vs. job condition rating: AVERAGE <br />~~~~~" "' Time value within basic rating: MEAN <br />Basic cycle time = 0.28 min. <br />bucket Capacity '°"""""""""" <br />_______________ <br />Rated capacity: 0.37 LCY (heaped) Size class: large <br />Bucket fill factor: 0.98 Loose material - mixed moist aggregates f95-1001) <br />Adjusted capacity: 0.36 LCY <br />Job Condition Correction Factors - Altitude adj. = 0.90 ICHBI <br />~~~~~~ """'~""' - Job efficiency = O.B3 Its/d cQft) <br />Site altitude = 6,600 ft. <br />'""-~~' Ne[ correction 0.75 <br />Unadjusted hourly unit production 77.30 LCY/Hr <br />Adjusted hourly unit production 57.75 LCY/Hr <br />Adjusted hourly fleet production 57.75 LCY/Hr <br />JOB COST <br />Fleet Size: 1 Excavatorlsl Total Job Time: 34.63 Hours <br />Unit Cosc $0.708 /cu. yd. Total Sob Cost: $1,x16.55 <br />_______ ___""______ <br />
The URL can be used to link to this page
Your browser does not support the video tag.