Laserfiche WebLink
RECLAMATION COST SUMMARY cant'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (H): <br />____________ <br />[. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (1): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />2 ~ Replace Topsoil ~ f1, 273 <br />Subtotal (J): f1,273 <br />