Laserfiche WebLink
<br />• EXHIBITI~ <br />RECLAMATION PLAN <br /> <br />The anticipated post mining land use will be grassland, <br />The haul road will be in the affected areal of the Pit,and <br />will enter the County road to the South. <br />We will mine 1 acre at a time and will reclaim the acre <br />each time we have completed the gravel extraction. <br />All slopes will be graded to no steeper than 3:1 and <br />contoured to match the natural terrain of the area. <br />Final grading will be approved by the Soil Conservation <br />Department, then the topsoil will be disced to a depth <br />of approximately 6" prior to seeding. After the completion <br />of fertilizing and seeding, mulch will be placed according <br />to the seeding plan. <br />Each 1 acre will be sloped subsequent to the completion of <br />• the mining operation . <br />See attached seeding and fertilizing plan. The Soil <br />Conservation Service seeding plan is just a guide. We do <br />plan on using this guide unless the Reclamation Department <br />from the Division of Minerals and Geology have another plan <br />they would want us to use. <br />The vegetation cover of the Pit area is sparse(25%) <br />• <br />