Laserfiche WebLink
<br />• EXHIBIT --MINING PLAN <br />We will restrict our operation to 1 acre at a time and when <br />we have completed the gravel removal from that one acre site <br />we will proceed with the reclamation of the one(1)acre site <br />as per Reclamation Plan submitted.(Exhibit E). <br />The Pit will be worked from the South fo the North using all <br />gravel in the one(1) acre location prior to opening up another <br />one(1) acre site. There wi]1 be 6" to 8" of topsoil removed <br />and stockpiled. At the completion of mining the one(1) acre <br />the topsoil will be replaced on the affected area of the Pit. <br />We will use the motor grader;front end loader and dozer fOr the <br />• reclamation. <br /> <br />