Laserfiche WebLink
<br />• <br /> <br /> <br />NORDYKE PIT OVERVIEW <br />The Pit is located approximately 11 miles Southeast of <br />Westcliffe, Colorado. <br />The pit will be mined by the contractor's personnel <br />for use on company roads and to sell to the public <br />and the County. There will be approximately 6" to 8" <br />of topsoil removed and stockpiled. The overburden <br />could be used as borrow to construct new roadways <br />or could be stockpiled. <br />The Contractor plans to use only 1 acre at a time to <br />mine the gravel and will reclaim the 1 acre site after <br />the removal of the gravel on the acre. <br />After the contractor has completed removing the gravel <br />from the 1 acre site, he will replace the overburden <br />that has not been used as borrow, then he will replace <br />all the topsoil, evenly, over the affected area of the <br />Pit. Then the contractor will fertilize,reseed, and <br />place mulch according to the seeding plan submitted in <br />the Reclamation Plan submitted by the Soil Conservation. <br />The vegetation cover of the Pit area is sparse. <br />