Laserfiche WebLink
iii iiiiiiiiiiiuiii • ~ • <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER R CEO oe~cota <br />Division of Water Resources E VED a~' <br />Department of Natural Resources FCB .~ <br />1313 Sherman Street, Room 818 C +? p ~ <br />Dem~er, Colorado 80203 8 2001 ~. r~~ <br />Phone: 1303) 866-3581 Division q/Minerals and Geology sill Owens <br />FAx: 13031 866-3589 <br />Governor <br />hit p 1/water. sta le.co. us/def au It. ht m <br />Response to Reclamation Permit Application Consideration Greg E. Walther <br />Execulwe Direclar <br />Hal D. Simpson, P.E. <br />Slate Engineer <br />DATE: February 28, 2001 <br />TO: James C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 12 Water Commissioner ~O <br />FROM: Michael P. Schaubs R.G. <br />RE: Grisenti Farms Gravel Pit, File No. M-2001-005 <br />Operator: Jessie M, James J and Joseph A Grisenti, <br />Contact: Castle Concrete Company, Gerald J Hermann (719) 475- <br />0700 <br />Section 13, Twp 19S, Rng 69W, 6th P.M., Fremont County <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwa[hr. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ® evaporation, ® dust control, ^ <br />reclamation, ®water removed in the mined product, ®procegsing, ®other..Lakes will remain <br />after reclamation is completed. <br />Prior to initiation of these uses of ground water, the applicant wlll need to obtain either a gravel pit <br />or other type of well pernrit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />requests hearing before the State Engineer. <br />^ Other: <br />COMMENTS: The Gravel Pit application indicates that a Substitute Wdter Supply Plan is to be submitted <br />to DWR. A Substitute Water Supply Plan has not been received by DWR to date. Groundwater cannot be <br />exposed by the operation or used as part of the operation until a Substitute Water Supply Plan has been <br />approved by DWR. <br />