Laserfiche WebLink
Colorado~iisionYofM1Minerals4andM1Ge~ogy <br />ESTIMATING FORM - SCRAPER WORK <br />------------------------------ <br />------------------------------ <br />TASK NO. 2 PREP. BY: JD PERMIT N0. M-94-011 <br />DATE 03/21/94 FILENAME: MO11-2 OPERATION: West End Pit <br />PERMIT ACTION Reclamation <br />TASK DESCRIPTION Replace Topsoil <br />HOURLY EQUIPMENT COSTS: <br />Single, Double or Triple <br />County: MONTROSE Labor Zone 1 Shifts S <br />Equipment Descriptions <br />Scraper team make-up :CAT 615C with ROPS cab <br />ti~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ <br />Road maint. - Grader :N/A <br />- Water T. :N/A <br />Scraper Team Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equipment Filename:615C-ROP N/A N/A <br />Utilization on job: 100% N/A N/A N/A <br />Cost Breakdown: <br />Ownership cost/hr: $31.68 N/A N/A N/A <br />Operating cost/hr: $44.59 N/A N/A N/A <br />Operator cost/hr: $20.56 N/A N/A N/A <br />- <br />Unit subtotals: ------- <br />$96.83 -------- <br />N/A --------- <br />N/A --------- <br />N/A <br />Scraper team subtotal $96.83 Maint. subtotal N/A <br />Total Work Team Cost/Hr: $96.83 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 1613 CCY <br />Cu.Yd. " " ~" "' Swell Loose <br />Volume: 1,613 CCY Factor: 1.125 Volume: 1,815 LCY <br />Source of quantity take-off:Calculation <br />Source of est. swell factor:Program <br />