Laserfiche WebLink
BBCLANATION C09T 9UXNABT cont'd • sheet 4 of 4 <br />H. PO@TAL~SNAFT 98ALINC <br />Task No.; Task Description Coet (fl <br />; ' <br />Subtotal (HI: <br />------------ <br />L. DBILL NOLB/XONITOBINC NBLL SBALINC <br />Task No.; Task Description Cost (SI <br />; <br />; <br />........:..................................................:............ <br />Subtotal (G~: <br />------------ <br />X. N[SCBLLAN60US HHCLAMATION TASHS <br />Task No.; Task Description Cost (fl <br />6 ;Haul and Spread 2 tons of Cypsum ~ 1300 <br />; Structural Demolition <br />3 8evegetation !949 <br />; Rencing <br />5 Nohilication/Demobilination !1,053 <br />Subtotal (MI: !2,302 <br />------------ <br />TOTAL DIBHCT BBCLAMATION COSTS (subtotals A through XI: (5,171 <br />------------ <br />II. INDI88CT COSTS <br />------------------------------------------------------------------------ <br />------------------------------------------------------------------------ <br />A. CONTBACTOB'S OVBBHBAD d P80FIT <br />Item No.; Itea Description ; Cost (fl <br />';' <br />1. Public Liability Insurance..., 1,550% of di r, ; S80 <br />2. Contractor's Performance Bond 0.975% of dir. ; fS0 <br />3. Contractor's Profit..,.,,..,., 10.00% of dir. 1517 <br />4. Jab Superintendent (total from xorksheetl ; <br />........................................................................ <br />Subtotal (AI: 1648 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 L PI: fS,819 <br />------------ <br />0. CXLBD CONTRACT ADX[NISTBATION H%PSNSBS <br />Item No„ Item Description Cost (!I <br />1, Contract Preparation Feea..,,, 4.25% of cntr.; 1247 <br />2. DNC Admin. Brpenses <br />........................................................................ <br />N8T INDIBBCT COST PBBCBNTACB: 17.31% Subtotal (BI: f247 <br />TOTAL INDIBBCT 88CLAXATION C09TS (subtotals A through BI: 1895 <br />TOTAL PBNFOBNANCB BOND AMOUNT (direct plus indirect coats(: !6,066 ~tru-.~.~ ~ ~~j ADD „ OD <br />