Laserfiche WebLink
Roadable equipment: ~ ~ sheet 2 of 2 <br />" " """ " "" " Total Sqp. Fleet Sine Naul Trip 8eturn Trip <br />Nachine Description Cost/hr (no. hauled) Coat/hr Cost/hr <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />Subtotals <br />XOB/DBHOB SUPP06T BQUIPHBNT: """"' " " ""' <br />"" " """ " " " " " " "' Height Oxnerahip Haul big Fleet Siae Haul Trip Return Trip DOT Permit <br />Non-Roadable Sqp. Description (tone( Cost/hr Cost/hr (no. hauled( Cost/hr Cost/hr Cost/ea <br />-------------------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------------------- <br />----------------------------------------------------------------------------- <br />----------------------------------------------------------------------------- <br />9ubtotals <br />Total Bqp. Fleet Siee <br />Roadable Bqp. Description Coat/hr (no. hauled( <br />----------------------------------------------------------------------------- <br />----------------------------------------------------------------------------- <br />------------------------------------- <br />------------------------------------- <br />......... ......... ......... <br />Raul Trip Return Trip <br />Cost/hr Cost/hr <br />------------------------- <br />------------------------- <br />------------------------------------------------------------------------------------------ <br />------------------------------------------------------------------------------------------ <br />BUbtnt8lA <br />BBUIPNBNT HAUL DISTANCE ! TINB <br />------------------------------ <br />------------------------------ <br />Nearest major city or torn xithin project area region: Naturita <br />.............................. <br />Total one xay travel distance = 8.0 <br />...... miles. Average travel speed = <br />.... 30.00 <br />......... mph. <br />Job Time -Non Roadable Squip.= 0.50 hours load Boadable 8quip,= N/A hours load <br />0,27 hours haul 0.27 hours haul <br />0.50 hours unload N/A hours unload <br />0.21 <br />------- hours <br />------ return <br />-------- 0.27 <br />-------- hours <br />------ return <br />-------- <br />JOB C09T <br />Total Mob/Demob Cost = l1, 053.01 <br />NOTB: Hon-roadable equipment (haul rig required to transport( mob/demob costa based an 2 round tripe, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required( <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip, <br />Additionally, pilot care (one or tvo per rig depending on degree of oversise( are also required for overaine <br />equipment haulimg, and loading/unloading times oust 6e increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costa For lifting equipment and other <br />support equipment needed for this vork should 6e included in the mob/demob coats. <br />