Exhibit 04e-3 Northern Mining District Subsidence Evaluation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table of Contents <br />1. INTRODUCTION .................................:.....................................................................1 <br />2. SUBSIDENCE PREDICTION ....................................................................................1 <br />2.1 Subsidence Monitoring Requvements .......................................................................................................... 2 <br />3. EVALUATION OF IMPACTS TO THE ENERGY SPUR TRACK ..............................2 <br />3.1 Scope of Work .............................................................................................................................................. 2 <br />32 Predicted Subsidence .................................................................................................................................... 3 <br />3.3 Impact Mitigation ......................................................................................................................................... 3 <br />3.4 Monitoring Requirements ............................................................................................................................. 3 <br />4. EVALUATION OF IMPACTS TO FISH CREEK AND ITS ALLUVIAL VALLEY <br />FLOOR (AVF) ................................................................................................................. 3 <br />4.1 Scope of Work .............................................................................................................................................. 4 <br />4.2 Approach ....................................................................................................................................................... 4 <br />4.3 AVF Subsidence Predictions ........................................................................................................................ 5 <br />4.4 Predicted Impacts to the AVF ....................................................................................................................... 5 <br />4.4.1 Increase in Fish Creek's Surface Area .................................................................................................. 5 <br />4.4.2 Potential for Fissure Development and Water Loss .............................................................................. 6 <br />5. EVALUATION OF IMPACTS TO FOIDEL CREEK ...................................................6 <br />6. MONITORING REQUIREMENTS .............................................................................6 <br />7. CONCLUSIONS AND RECOMMENDATIONS .........................................................6 <br />• <br />PN: 98-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.