Laserfiche WebLink
Sampling Sampling <br />Location Date <br />North Thompson <br /> <br />Upstream 6/27/84 <br />North Thompson <br /> <br />Downstream 6/27/84 <br />Roaring Fork 6/28/84 <br />Upstream . <br />Roaring Fork <br />Downstream 6/28/84 <br />Middle Thompson <br />Upstream 6/28/84 <br />Middle Thompson <br /> <br />Downstream 6/28/84 <br /> MONTHLY SURFACE WATER MEASUREMENTS <br /> SNOWMASS COAL COMPANY <br /> NORTH THOMPSON CREEK MINES <br /> PH Temperature Conductivity Flow Rate <br />Time (nearest 0.1) (°C) (Umhos @ 25°C) cfs <br />12:00/pm 7.7 10.1 °C 88 umhos n 150 <br />12:30/pm 7.8 9.5 °C 150 umhos n 150 <br /> <br />12:30/pm 7.0 10.5 °C 155 umhos -- <br />1:30/pm 7.1 10.5 °C 185 umhos -- <br />8:00/am 7.6 8.3 °C 65 umhos n 150 • <br />9:00/am 7.7 8.2 °C 60 umhos n 150 <br />Creek levels are still to high to measure using velocity guage. <br />