Laserfiche WebLink
COAL COMA4NY QUARTERLY POND INSPECTION REPORT <br /> <br /> <br />Inspector Name: Lg2Qy /Gerc,l,~'e Date: 4-/6-92 <br /> <br />Pond Number: S' Date Last Inspection: /- 2 ?.9 2 <br /> <br />Site Name: Ain rv Of f/Gf. Quarter: fe co..~d / 99 z <br /> <br />1. Design Depth Measured From Spillway Invert /, 2 0 <br /> <br />2. Design Maximum Sediment Le vel Measured From Spillway Inv ert /~0 0 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2.4 <br /> <br />4. Water Level Measured From Spillway Invert i to.~e <br /> <br />5. Discharge Through Spillway Since Last Inspection _ Yes ~° No <br />6. Rills and Gullies _ Yeses No <br />7. Vegetation Adequate ~ Yes _ No <br />8. Outlet Channel Erosion _ Yes _~ No <br />9. Animal Burrows Yes X No <br />10. Cracks Yes X No <br />11. Seepage _ Yes X No <br />12. Spillway Clogged Yes ,~ No <br />13. Valves Operational x Yes _ No <br />ADDITIONAL COMMENTS: ,fto/i~ne,i~ /?/1g2krAf 2e n., ,artkr.~ <br />MAINTENANCE REQUIRED:^it/o~..c <br />- - ¢ F - <br />W ~ o <br />3 '~ <br />A <br /> SP/ttWAY SNVE, <br />- ~--- - - <br />2 v~ p ~ Z <br />h a n 0. <br /> <br />p i <br />h ~ <br />i o w <br /> Fl ' <br />~ .. ti <br />