My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61507
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:04 PM
Creation date
11/20/2007 7:11:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Permit File
Doc Date
7/10/1979
Doc Name
MEMO INADEQUACY REPORT FOR SNYDER QUARRY 77-10 & PIKEVIEW QUARRY 77-211
From
MLR
To
DAVE SHELTON
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COlORA00 PiC Hnap Gov e•~or 'll'I"If,l""~ ~I~ <br />DEPARTMENT OF NATURAL RESOURCES 999 <br />Harris D. Sherman. Executive Director <br />MINED LAND RECLAMATION <br />723 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (3031 892-3567 <br />M E M O R A N D U M <br /> <br />Hamlet J. Barry, III, <br />Director <br />T0: Dave Shelton <br />FROM: Jim Schmieding <br />DATE: July 10, 1979 <br />RE: Inade uacy report for Snyder Quarry(N77-10) b Pikeview Quarry(1i77-211) <br />Snyder Quarry <br />Subsequent to our review of the Snyder Quarry application and the sup- <br />plemental information received Dec 16, 1977, August 8, 1978, anti June 25, <br />1979, I have determined that several items remain inadequate. <br />These items are as follows: <br />A Mining Plan: <br />1. What drainage control measure s, surface and/or subsurface, <br />are planned to ensure that the water in the retention area <br />will not rise to the 7025 ft. elevation causing the berm to <br />act as a dam. <br />B Reclamation Plan: <br />1. More specific information as to the planting of the trees <br />and shrubs is required. Items include spacing of the <br />trees and shrubs, number of trees and shrubs, when the <br />trees and shrubs will be planted, where the trees and shrubs <br />will be obtained and how the trees and shrubs will be <br />protected. <br />2. What nitrogen fixing legume will be added to the seed <br />mixture? <br />3. Two inches of topsoil is insufficient and needs to be <br />increased to four to six inches. <br />4, Must be more specific as to the planting of the trees and <br />shrubs on the berm such as stated under 8.1. <br />Pikeview Quarry <br />A Reclamation Plan: <br />1. Trees and shrubs must also be added to the revegetation <br />program and should specifically state the type of trees and <br />shrubs used, where the trees and shrubs will be obtained, <br />
The URL can be used to link to this page
Your browser does not support the video tag.