Laserfiche WebLink
9. Berm, cut a portion of the berm and spread as overburden <br />on-site, SOsf per 2,400 of berm 4,500 CY $1.25 $ 5,625 <br />] 0. Topsoil, grade at 6 - 12 in 18,000 CY $1.25 $22,500 <br />11. Seed and mulch 24 Ac $800 $19,200 <br />F. Lakeshore final grade with overburden and topsoil <br />1. Replace overburden, 12 in on 2 ac 3,225 CY $1.25 $ 4.032 <br />2. Replace topsoil, 6 - 12 in 1,700 CY $1.25 $ 2,125 <br />3. Seed and mulch 2 Ac $800 $ 1,600 <br />G. Lakeshore seeded <br />1. Seed and mulch <br />2 Ac $800 $ 1,600 <br />Disturbance Costs <br />Contractor Mob/Demob (8%) <br />Overhead (I8.5%) <br />Administrative (5%) <br />Total Proposed Financial Warranty <br />Disturbed Acreage <br />Financial Wartanty per Acre <br />$109,957 <br />$ 8,797 <br />$ 20,342 <br />$ 5,498 <br />$]44,594 <br />40 <br />$ 3,615 <br />L-2 <br />