Laserfiche WebLink
• ~ • • <br />ADDITION TO EYHIPIT D - Reclamation Flan <br />4. <br />When mining in the pit is terminated the reclamation <br />will be in two phases: First the riverbed will 6e smoothed <br />to a 4:1 slope or flatter and left for natural flood flaw to <br />restore the gravel content and the original condition. <br />The river bank: which may have been used for a stocF::pi.le <br />and loading area will be smoothed and while the top soil <br />will not have been removed it may be covered to deeply to <br />provide good germination. For this reason a manure mulch of <br />'~J tans per acre of chun4;y manure will be spread aver the <br />area to provide nitrogen and phosphorus and to protect the <br />area from erosion. The area will also be fenced to protect <br />from grazing livestac4::. <br />The seeding will follow the plan provided by the <br />Flagler 9oi1 Conservation District. <br />