Laserfiche WebLink
1. Beelaaation plan <br />Itemise mlamatioa plan - show how plan will rababilitata the <br />area disturbed by the adniag operation. <br />A. use of reolamation Brea <br />H. why each ors chosen <br />C. ssxanat of saraaga aaaorded to each <br />D. diatssbancea caused b3' mining end affeata upon: natural <br />vegetation, wildlife, eater, air, and soil. <br />E. head atatesaata from: <br />a) Colorado Division of Wildlife <br />b) lister Haeoureas Haport - (Wales Bog. report) <br />2. xaelsmatioo Nap • <br />A. present pbysieal appaaraoee of atleated lands shown by <br />topography to contour lines <br />H. expected physical appearance o! area to be mined <br />C. portrayal of proposed f1aa1 lead use !or each portion of <br />affected land. <br />S. Vegetation Nap - <br />Includa on sails map examples Boll type B!1 - H - list dominant <br />plane species <br />4. Csoea-sectional map with topography shawALggaquifera in Brea that <br />would be affected. (If none exist - so state) <br />S. Oeaeral Msp - <br />Snbmitted at attan6meat is good - times needed however, identi- <br />fication of adjaaaat sdniag if say, location of all areeka, <br />roads, buildings, oil and gss wells, and linos, power sad <br />aamaunication lines - to inaluda complete as+ea extending 400 <br />feet begond all affected area, (including stockpile area, etc.) <br />6. Timetable of mining operation and reclamation - scads to be <br />more specific. <br />~. 8ive completed copies of the application. <br />