My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26834
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:18 PM
Creation date
11/20/2007 7:10:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
12/7/1990
Doc Name
4th Qtr 1990 Inspections
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: DATE: 10/20/90 <br />NPD ES I.D. NO.: - D.P.OO8 <br />FAC ILITY CONFIGU ~: Cross-Valley Pon DATE LAST INSPECTION: 7/23 /90 <br />SIT E NAME: Pond #008 LOCATION:SW'hNW'/~, Sec. 7, TSN~~ <br />MIN E NAME: eneca the ea o y oa o LOCATION: mt. o ay en, <br />MIN E I.D. N .: ermtt - - OWNER'S R ,, on u tan, upt. <br /> Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil): _ es No N/A <br />2. Lift thickness: 12 in. N/A <br />3, Compaction according to approved plan: © No N/A <br />4, Burning (specify extent and location): Yes No T <br />5. Angle of slope: 3:1 upstream, 3:1 downstream T otal = 6:1 N/A <br />6. *Seepage (specify location, color, and approximate volume) <br />~_ From underdrain pipes: Yes No <br /> At isolated points on em an men s opes: Yes ® N/A <br /> At natural hillside: Yes N/A <br /> Over widespread areas: Yes N N/A <br /> From downstream foundation area: Yes N/A <br /> "Boils" beneath stream or ponded wa er: Yes N/A <br />7. Cracks or scarps on crest: Yes ® N/A <br />8. Cracks or scarps on slope: Yes ® N/A <br />9. Sloughing or bulging on slope: Yes ® N/A <br />t0. *Major erosion problems: Yes ® N/A <br />11. Surface movements in valley bottom or on hillside: Yes ® N/A <br />12. *Erosion of toe: Yes ~ N/A <br />13. *Water impounded against toe: Yes ® N!A <br />14. Existing embankment freeboard: 8.4 feet <br />15. Increase Decrease in water level: p feet <br />16. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />t7. Visible sumps or sinkholes in slurry surface: Yes No N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes 1~q N/.4 <br /> Decant system: Yes No (~ <br /> Diversion ditches: Yes No <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes ® N/A <br /> Decant system: Vie? No <br />20. Trash racks clear and in place: 'e No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse condi- <br />tions noted in these items should normally be described (extent, location, volume, etc.) <br />in the space on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.