Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC Quarter: Second 2005 <br />Bowie No. 2 Mine - C-96-083 Inspection Date 15-Jun-05 <br />Identification <br />of Pond <br />is During Inspection: <br />~ximate Water Level <br />B C D -Gob Pile F -New Gob J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment Sediment <br />Sediment (% total storage) 25% 50% 10% 0% 0% 10% <br />Outflow (cfs) 0 0 0 0 0 0 <br /> <br /> <br />Features Problem Problem Problem Problem Problem Problem <br /> Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No <br />Erosional <br />Rilis & Gulleys No No No No No No <br />Inadequate Vegetation No No No Yes No No <br />Outlet Channel Erosion No No No No No No <br />Burrows No No No No No No <br />Other No No No No No No <br /> <br />Structural <br />Differential Settling No No No No No No <br />Cracks or Slides No No No No No No <br />Seepage No No No No No No <br />Other No No No No No No <br /> <br />Appurtenant Structures <br />Defective Spillways No No No No No No <br />Dewatering Devices Clogged No No No No No No <br />Faulty Gates, Elc. No No No No No No <br />Other No No No No No No <br /> <br />Additional Comments The water in Ponds B, C & D was above the level of the primary s pillway. <br /> Pond B 8 C were being dewalered at the time of t he inspection. <br /> Design depth measured from pond bottom to inve rt of emergency spillway: <br /> Pond 8=10, C=10, D=7.7, J=6, K=4, F=10' TD <br /> •~~+am`~ <br />R Et;'~J, <br />~~PDO <br />Maintenance Required: Keep ponds dewalered. • 10 <br />° <br /> ~~~0. ~S E Sp• ,F9 i <br /> i~~~ ~% °~ <br />Name of Inspector: Jim Stover ~ ~ • "S <br />er t ~ <br />P. E. 19230 D,~t¢r~ <br />