My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61451
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:02 PM
Creation date
11/20/2007 7:09:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 69 Section A II. Mine Dewatering and Treatment Facilities Project Description
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 1 <br />FACILITIES DESIGN CRITERIA <br />Parameter Design Value <br />Treatment Design Flow 2,000 gpm <br />Hydraulic Design Flow 4,000 gpm <br />Number of Treatment Process Trains 2 <br />Treatment Design Flow per Train 1,000 gpm <br />Hydraulic Design Flow per Train 2,000 gpm <br />Design Influent Total Suspended Solids 1,000 mg/L <br />Effluent Total Suspended Solids <25 mg/L <br />Facilities Description <br /> <br />Mountain Coal Company <br />West Elk Mine <br />Exhibit 69 <br />Mine Dewatering & Treatment Facilities <br />The facilities design criteria for the dewatering and treatment systems aze summarized in <br />Table 1. <br />Following is a description of the individual components of the Mine Dewatering and <br />Treatment Facilities. <br />Dewatering Pump Station and Treatment Building <br />The Dewatering Pump Station and Treatment Building contains both the mine <br />pumping equipment and the mine water treatment equipment. The Dewatering <br />Pump Station portion of the building will consist of two 2,000 gallon per minute <br />(gpm) deep well vertical turbine pumps. OneTke deep well pumps will be mounted <br />at and stored as a back-up/spare and the other will be at the surface of the 18~8- <br />inch cased borehole° /°'~°^a° ^^M«'°'°a «°- n,rn '"" and will have a column depth <br />of approximately 600 feet. The holes has-Dave been completed to the operational <br />sump in the northeast corner of the lONE Tailgate. This operational sump will <br />serve as the pump system wetwell. <br />`J <br />TL,. L^Y°l,^I°° 1^^^•°.7 «.^t°L. 1Z F °t .....+ /..°«t°.1:«° ~.. <br />^°} The pumps will discharge to three possible locations: the <br />presedimentation basin, the recirculation borehole(s), and/or the treatment <br />equipment. The recirculation borehole is a 12-inch cased borehole (already <br />completed per MR 212) that is located approximately 100 feet south of the pump <br />boreholes. The borehole is within the building footprint and will recirculate water <br />z~ <br />Oct. 1997 TR83. Revised May 1998 MR243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.