My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26821
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:17 PM
Creation date
11/20/2007 7:09:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Hydrology
Doc Date
2/12/1990
From
FOUR CORNERS CONTRACTING SERVICE
To
MLRD
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_„ <br />Cap Allen Engineering <br />145 East 13th Street • Durango, Colorado 81 301-51 30 (303) 247-0088 <br />Lynn Fechter <br />REF: BLUE FLAME COAL MINE CALCULATION OF NEW STRUCTURE TO RETENTION <br />POND <br />In view of the deviation from the 1 /2 24" cmp specified on the <br />above project, a calculation has been done for the new pipe. <br />To construct the new pipe, metal roofing material was used. An "n" <br />of 0.020 was assumed. The slope of the conveyance is nowhere less <br />than 2$, and the capacity will thus be adequate for the 3.53 CFS <br />calculated as required. <br />Thank you, <br />~"ap Al~~len <br />12/6/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.