Laserfiche WebLink
T <br />U <br />• <br />0 <br />0 <br />• <br />O <br />O <br />1 • <br />�29 I <br />29 !1 c4ao <br />100', <br />•� o <br />N <br />029 -5 <br />•!00' <br />6580' <br />.2� <br />! 22' <br />O <br />I <br />6580 <br />•2[- 3 <br />35' <br />0 <br />• <br />\6593' <br />11120 <br />2 29 -2 <br />1 /1 <br />o, <br />• <br />• <br />i <br />■ <br />I <br />1\ <br />64 <br />29 <br />i4 55-Kl; <br />24 1 6561' <br />\ •29 <br />go, <br />6596 ' <br />` 00 9 4 <br />R63W <br />i <br />t <br />6665' <br />•29 -9 <br />(135' <br />w <br />� \1 <br />1 <br />6594' <br />• 29 -12 <br />60' <br />• <br />• <br />6578 <br />J29 -I <br />ale ill <br />J <br />REVl5 /0N <br />05/04/88 <br />I certify that this drawing was prepared by me, or under my 0 <br />tf�Yj ♦� supervision, and that the information contained herein is rA <br />j.wC 4 eccurate to the beat of my knowledge and belief. <br />1- 10 rill Signed _ _�i2 rvL Date -- <br />W. M. Kerr, P. E. 11S <br />/GG06 <br />'0 i <br />6600: <br />6700 <br />LEGEND <br />(ij Original proposed drill site <br />6.582' hole elev <br />29 -11 ho ,'c no. Completed drill hole <br />50, d?plh <br />i <br />, i f <br />d <br />Ui ❑ I <br />E w & a M <br />Z odoa <br />Ja UJ�i�ri�o <br />R/MROCK COAL COMPANY <br />DRILL HOLE COMPLETION AMP r� <br />ING TO <br />Notice of In - ert No X-87-202-00 <br />SCALE l" =200' *'MAP 3 <br />