My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26807
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:16 PM
Creation date
11/20/2007 7:08:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
7/21/1998
Doc Name
2nd Qtr 1998 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponda or Sumps <br />INSPECTOR'S NAME: Rw Karo <br />FACILITY CONFIGURATION: stoc and <br />SITE NAME: T-3 <br />MINE NAME: F n a TT <br />MINE I.D. NO.: C-80-ODS <br />DATE: 05~12~98 <br />DATE LAST INSPECTION: 03 ~/13~28 <br />LOCATION: Ngi~~~r cPr t 1 TSN R87w <br />LOCATION: 7.1 mi 9R of Hay des CO <br />OWNER'S REP.: Brad Brown Can Mq~ <br />1. Angle of elope: a:1 upstream, 4:1 downstream <br />2. <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5 <br />6 <br />7. <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />B. *Eroaion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Aonrox imately <br />11. increase Decrease in water level: No change <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: _ <br />14. *clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes ~ N/A <br />Yee No N/A <br />Yes No N/A <br />Yee No N/A <br />Yea ~ N/A <br />Yee No N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yee N® N/A <br />Yea ~ N~A <br />___5_ feet <br /> feet <br />Yee ® N/A <br />Yee ® N~A <br />Yee ~ N/A <br />Yes o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 8:~ N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.