My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26807
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:16 PM
Creation date
11/20/2007 7:08:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
7/21/1998
Doc Name
2nd Qtr 1998 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORN <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: Roy Raro <br />FACILITY CONFIGURATION: stoc pond <br />SITE NAME: T-5 <br />MINE NAME: Seneca II <br />MINE I.D. NO.: C-80-005 <br />1 <br />2 <br />3 <br />DATE: 05/12/98 <br />DATE LAST INSPECTION: 03u3/98 <br />LOCATION: sWkNF3~~ TSN R67w <br />LOCATION: 7.1 m; cF. of Ha en, CO <br />OWNER'S REP.: Brad Brown Gen Mqr <br />Anqle of elope: 2:1 upstream, a:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath et ream or ponded water: <br />Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5. <br />6. <br />7. <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />B. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: awn ox;ma ~y <br />11. ~ Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: - <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes N N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yes N~ N/A <br />Yee ~ N/A <br />Yee No N/A <br />Yea ® N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee No N/A <br />Yee ~ N/A <br />Yee I~o N/A <br />_5_ feet <br />~ feet <br />Yes N~ N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee N N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />Total = 6.1 N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.