Laserfiche WebLink
TABLE 3 <br /> ORCHARD VALLEY MINE TRAFFIC DATA <br />_ • (Vehicles Per Day) <br /> Production Level <br /> (Tons per year) <br /> 700,0001 1.3-Million2 <br />Base Traffic3 - SH 133 <br />7 A, M. - 10 P. M. 11365 1921 <br />10 P, M. - 7 A. M. 250 257 <br />Coal Trucks <br />r_ <br />~~ 7 A. M. - 10 P. M. 201 349 <br />10 P. M. - <br />r 7 A. M. 0 23 <br />~_ FJnployee Traffic - Stevens Gulch Road <br />- 7 A. M. - 10 P. M. 140 1904 <br />10 P. M. - 7 A. M. 40 904 <br />• 1 <br />- Assumed one trucking shift (7 A. M. to 3 P. M.). <br /> 2 Assumed two trucking shifts (7 A. M. to 3 P. M., 3 P. M. to 11 P. M.). <br /> 3 <br />`- Includes current employee t raffic. <br />r <br />L 4 Addition al 50 vehicles for increased production conservatively assumed <br /> to also travel in affected section of SH 133. <br />C <br />r, <br />~~ <br />u- <br />L <br />,• <br />-20- <br />