Laserfiche WebLink
~CamE~t ana ~~~'otiate,~~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY DIARY <br />REPORT NO. <br />PROJECT NUMBER M84060MT <br />PROJECT NAME West Elk Mine Pond <br />PROJECT LOCATION Somerset, CO <br />CLIENT ~ West Elk Coal Company <br />CONTRACTOR Beaver Construction <br />FOREMAN <br />DATE 7/g~gq <br />TECHNICIAN Harris <br />HOURS WORKED <br />WEATHER CONDITIONS <br />Cloudy/Rain <br />WORK REQUESTED Soils <br />WORK PERFORMED BY CONTRACTOR (AND EQUIPMENT) <br />Small hand compactor was compacting material around pipe. <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />Density tests were performed on top lift and -4 feet on pipe section. <br />P. O. BOX 3986 P.O. BOX 0045 278 SAWYER <br />GRAND JUNCTION, CO 87502 MONTROSE, CO 87402 DURANGO, CO 87307 <br />(303)245-6506 (303)249-2754 (303) 259-5095 <br />