Laserfiche WebLink
<br />chord which bears S 38°11'29" ai for a distance of 43:.41 <br />feet; thence S 23°39'01" e4 for a distance of 309.80 fe:: t; <br />thence S 21°19'32" W for a distance of 1875.00 feet more or <br />less to the south line of Section 15, said point bearing S <br />26°51'14" W a distance of 3307.15 feet moze oz less from <br />Corner 3 of Homestead Entry k122, said corner being a Gov- <br />ernment Stone Monument. <br />Containing 50.6 acres more or less. °008 Yu1 r'.-:.: ..i•-.1 <br />Together with a tract of land to be used for drainage <br />Facilities and road fill purposes described as beginning at <br />the point of intersection of the southerly right-of-way <br />fence line of County Road 817 with the southeasterly bound- <br />ary of the above-described transportation corridor, thence <br />easterly along the southerly right-of-way fence line of <br />County Road 817 for a distance of 90 feet to a point on s.sid <br />right-of-way fence line, thence northwester lv to a point on <br />the southeasterly boundary of the above-described transpor- <br />tation corridor which is 25 feet from the point of beginn.i ng <br />along said southeasterly boundary; thence along said south- <br />easterly boundary for a distance of 25 feet to the point of <br />beginning; and <br />Together with a non-exclusive right-of-way and easement 90 <br />feet in width Eor an access road adjoining the above-des- <br />cribed transportation corridor on the southeast side, from <br />the northerly right-of-way line of County Road 817 For a <br />distance of 250 feet (measured from the northerly right-of- <br />way-fence line of County Road 817 northeast along the above- <br />described transportation corridor; and . <br />Together with a right of entry outside the above-described <br />transportation corridor onto adjacent lands during the period <br />of construction for the purposes of (a) constructing and <br />installing land service facilities in conjunction with and <br />appropriate to the facilitres being constructed in the <br />above-described transportation corridor, such as relocated <br />farm roads, right-of-way fences, culverts, approaches for <br />farm road at-grade crossings, county road detours, irriga- <br />tion and drainage facilities; (b) constructin3 channel <br />changes in Wiison Creek in the permitted locations; (c) <br />constructing slopes from er rthwork operations for the <br />facilities constructed within. the above-described trans- <br />portation corridor; and (d~ wasting excavation materials at <br />locations specifically authorized by Grantor. All such <br />facilities constructed outside of the above-described <br />transportation corridor shall be left in a final condition <br />which is acceptable to Grantor and Grantor shall have full <br />use of such facilities and areas after construction has been <br />completed. <br />NOTE: All bearings based on the Colorado Coordinate System, <br />North Zone. <br />• <br />_2_ <br />