My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61277
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:55 PM
Creation date
11/20/2007 7:06:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003021
IBM Index Class Name
Permit File
Doc Date
6/28/2003
Doc Name
Cost Summary Form
From
DMg
To
Environmental Alternatives Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 06/25r2003 <br />User: JD1 <br />County :Fremont <br />Site :Ranch Land Rock Pit #2 <br />Agency or organization name : DMG <br />Permit or other job action :Phased reclamation <br />Task description :Grade t!OpSOiI <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DSR Series 11 - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownershipcost/hour : $44.49 NA <br />Operating cosUhour : $61.72 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosf/hour : $24.01 NA <br />Total unit cosUhour : $130.22 Total fleet cosUhour : $130.22 <br /> <br />MATERIAL QUANTITIES ;: :.. <br />Initial Swell Loose <br />volume : 8,000 LCY factor : NA volume : 8,000 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />;:. <. <br />;: >:: <br />HOURLY PRODUCTION <br />; <br />Job Condition Correction Factors <br /> <br />Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 515.8 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.50 % (~ <br />Average site altitude : 5,310 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.242 /LCY <br />State :Colorado <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.01 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 1.04 <br />Adjusted unit production : 537.30 LCY/hr <br />Adjusted fleet production : 537.30 LCYIhr <br />Total job time : 14.89 Hours <br />Total job cost : $1,939 <br />PermiUjob# : M-2003-021 <br />Abbreviation :none <br />Filename :M021-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.