My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61208
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:51 PM
Creation date
11/20/2007 7:04:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
9/28/2007
Section_Exhibit Name
Part 778 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 778.17 (a) Continued. <br />Revised 11/20/80 <br />The proposed timetable for each phase of mining and reclamation <br />including the anticipated number of acres of land to be affected is <br />shown in Table 2, Affected Areas for `lining and Reclamation. This <br />Tab Le covers the entire area to be mined because the amount of <br />disturbance proposed during the five-vear permit term will roughly <br />coincide with the extent of the total area to be disturbed within <br />the mine plan area due to the nature of the proposed pit and the <br />preparatory work required prior to actual overburden removal. <br />(b) If the applicant proposes to conduct the surface mining activities <br />in excess of 5 years, the application shall contain the information <br />needed for the showing required under 30 CFA 786.25(a). <br />Although the permit herein applied for will expire and be subject <br />to renewal five years from the date of issuance, this application <br />is full and complete for the entire mine life and corresponding <br />Mine Plan Area. Two to three years of mining will remain at the <br />termination of the initial permit, but because the steady state pit <br />conditions require approximately 5,600 linear feet of active mining <br />area to be open at any given time, 90 X of the total surface dis- <br />turbance to take place within the Mine Plan Area will occur during <br />the first five years as shown on Map 31a, Kerr "tine Area Soil Re- <br />moval and Storage. Additionally, because of the extent of distur- <br />bance all drainage control facilities will be installed during the <br />first five years. Due to the above-mentioned facts, Ketr Coal <br />requests that the permit boundary be coincident with the Mine Plan <br />Area and has structured this application accordingly. <br />Section 778.18 Personal Injury and Property Damage Insurance Infor- <br />oration. ~~~4,~~1.234S6,>~ <br />~ ` <br />778-26 as ~ ~~'1-'Di381 <br />APPRUVEa <br />OSHA-DO9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.