Laserfiche WebLink
Abatement: Kerr sukmitted a revised sediment control plan (hfft-14), <br />• and field irtq~lemented the approved plan. <br />Resolution: NOV C-93-022 was terminated and a civil penalty of $550 <br />was assessed and paid. <br />NOV C-93-029 <br />Issued by: Colorado Mined Land Reclamation Division <br />Date: April 7, 1993 <br />Description: Failure to have a non-clogging dewatering device on <br />Sediment Pond E. <br />Abatement: Kerr installed an appropriate dewatering device on Pond <br />E. <br />Resolution: NOV C-93-029 was terminated and a civil penalty of $550 <br />was assessed and paid. <br />The following violations were subject to administrative or judicial <br />proceedings. Specifically, a total of six cases were filed before the Office <br />of Hearings and Appeals (OHA) and the U.S. District Court inwlving the <br />following violations. All of the cases have been vacated per the terms of <br />• and with croag~letion of performance under the Settlement Agreement dated <br />December 8, 1994 between Kerr Coal Cort~ny, Division of Minerals and Geology, <br />and the Office of Surface Mining. <br />NOV No. 94-020-352-003 <br />Issued by: Office of ~„-l=ace Mining <br />Date: May 25, 1994 <br />Description: Alleged failure to achieve AOC in the portion of Pit 1 <br />containing Federal lands. <br />Abater-nt: Kerr c~leted supplemental backfilling and grading under <br />the terms of the Settlement Pgreertent. <br />Resolution: NOV 94-020-352-003 was ter*n;nated. <br />~ No. 94-020-250-1 <br />Issued by: Office of Surface Mining <br />Date: August 24, 1994 <br />Description: Alleged failure to abate NOV No. 94-020-352-003 on a <br />timely basis. <br />Abatement: Abatemssit of this NOV was addressed under the Settlement <br />• Pgreerrent . <br />H.~85TVOL.1\TR~I ~+_1.P05 <br />uvu~Ae i:atm wr~i~®c 778-11aR Revised - April 1996 <br />~ ~1 D~ <br />