Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />t <br />t <br />1 <br />3.2.2. GMG Mine Waste Pile (Reference Map 7) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, inst~dlation and/or <br />application of contours, berms, silt fences, straw bales, water bars, fertilizatioNre- <br />vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />3.2.3. Carnation Mine Waste Piles (Reference Map S) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, silt fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />mitigate stormwater surface erosion and stormwater migration. On final naclamation the <br />the waste pile will be graded, leaving it slightly concave in the carder to control <br />stormwater migration. All mitigation measures will be done on the oril~inal foot-print <br />(affected area) and in accordance with Federal and State Regulations. <br />3.2.4. St Jude Mine Waste Pile (Reference Map 8) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, silt fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />mitigate stormwater surface erosion and stormwater migration. On final n3clamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />stormwater migration. All mitigation measures will be done on the oriiinal foot-print <br />(affected area) and in accordance with Federal and State Regulations. <br />3.2.5. West Sunday Mine Waste Pile (Reference Map 9) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, silt fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />mitigate stormwater surface erosion and stormwater migration. On final rErclamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />stormwater migration. All mitigation measures will be done on the original foot-print <br />(affected area) and in accordance with Federal and State Regulations. <br />3.2.6. Topaz Mine Waste Pile (Reference Map 10) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, installation and/or <br />application of contours, berms, silt fences, straw bales, water bars, 1'ertilizatioNre- <br />vegetation will be initiated to mitigate stormwater surface erosion ar~d stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />8 <br /> <br />