Laserfiche WebLink
• <br />\J <br />• <br />WEST MINE <br />Section 5 Diversion Ditch Cross Slope <br />5.4-4 n= earth bottom, rubble sides n= .032 <br /> Diversion Ditch Calculation <br />Section 4 <br />Page No. <br /> Basis (as before) <br /> 10 yr. 24 hr. storm occuring in 6 hours = 1.6" <br /> CN poor posture, range = 89 <br /> runoff = .75" <br /> (see blow up of U.S.G.S. quad s heet) <br />15.7 Lag Time L= HL'8 (S + 1)'7 L= lag in hours <br /> 1900Y 'S <br /> HL = Hyd length <br /> L= (2200).8( 1 <br />0 ' 10~ +1).7 <br /> 89 <br /> 1900 (59)'5 s= 1000 - 10 <br /> CN <br /> L= 472 1.76 CN= 89 <br /> 1900 7.68) y= slope <br /> L= .057 hours = 3.4 minutes <br />16.7 Peak Runoff <br /> qp= 484 AQ qp= peak runoff <br /> ,L1 D +L <br /> 2 Q= rainfall in inches <br /> = 484 .053 A= area in sq. miles <br /> 6 + .057 <br />~ <br />pD= duration of rain <br /> = 8.4 second feet L= lag time <br />A= 4 sq. ft. = z d2 <br />Area Area A= bh = 8x1 = 4 sq. ft. <br />2 ~- <br />Wetted Perimeter <br />$ i' h <br />b <br />p= b+h = 8+1=9 <br />