Laserfiche WebLink
EAST MINE <br />• Principal Spillways <br />The principal spillway will carry the runoff amount within 6 <br />hours. <br />Substation Pond <br />Laydown Pond <br />East Mine Pond <br />• <br />EAST MINE <br />Emergency Spillway Calcualtion <br />• <br />West Mine U.S.S. Pond <br />.07 acre feet X 43560 <br />6 hours X 60 min./hr.X <br />60 sec./min. <br />.68 acre feet X 43,560 <br />6 hrs. X 60 min./hr. X <br />60 sec./min <br />.41 acre feet X 43,560 <br />6 hrs. X 60 min./hr. X <br />60 sec./min. <br />WEST MINE <br />.50 acre feet X 43,560 <br />6 hrs. X 60min./hr. X <br />60 sec./min. <br />Norris Pond .28 acre feet X 43,560 <br />6 hrs. X 60 min./hr. X <br />60 sec./min. <br />_ .14 second feet <br />_ .16 second feet <br />_ .83 second feet <br />= 1.01 second feet <br />_ .56 second feet <br /> From National Engineering Handbook, Section 4 Hydrology Section 5 <br /> Hydraulics <br />Section 4 <br />Page No. <br />9.2 Basis: 25 yr. 24 hr storm of 2.8" occuring in 6 hrs., poor pasture <br />10.21 or range CN 89. <br /> Runoff = 1.7" <br />15.7 Lag Time L= H1'8 (S + 1)'7 L= Lag in hours <br /> 1900 Y'S H1= Hyd. length <br /> S= 1000 - 10 <br /> CN <br />