My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26737
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:11 PM
Creation date
11/20/2007 7:03:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
6/15/2001
Doc Name
2Q 2001 Sediment pond inspection
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />'~ 1 <br />' ~ ~~_ <br />BASIN RESOURCES, INC. , .- <br />SE__D~~IM~~ENT~ATI~ON PO,1ND INSPECTION FORM <br />Pond Gr/~i~~.r~Y G>Y,/a~~,~rtJl_' '~/ NPDES No. //r~-~- <br />Date of Inspection ,)cevr~ iS{ z~~~ <br />r. <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, dera .. Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ery None <br />3. Is wave action causing erosion <br />On the upstream embankment? Yes No ~~ <br />At the principal spillway inlet? Yes ~ ~ No <br />4. Erosion of the dowrutream toe of the embankment? Yes No v <br />The cause of the erosion is attributed [o: <br />5. Ls seepage occurring through the dam? Yes Nom <br />Could this seepage cause potential instability? Yes No <br />Explain: <br /> <br />PR1NClPAL SPILLWAY /J 5r: ~~u' <br />1. Is the principal spillway system in working order? ~ <br />Yes <br />No <br />?. Is the role[ free of debris and restrictive material" Yes No <br />3. [s the discharge outlet free of restrictive material? Yes No <br />~. Is erosion occurring at the discharge outlet'? Yes No <br />Evaluate the severity Exensrve Moderate Just Starting None <br />EMERGENCY SPILLWAY i":~ ~:,%~;,.;/,rc~ S~!~w%='~ <br />1. Is the overall emergenry spillway system capable of passin design storm discharge? <br />Yes Na <br />?. Doe's it appear as if [he emergency spilhvay has discharged water since the last inspection? <br />' Yes Na <br />3. [s erosion occurring a[ any section of the emergency spillway? Yes No <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the destgn storage capacity of the reservoir been surpassed? <br />[f yes. explain: h~~/r~ rs Cdr.-~ <br />Yes No ~-- <br />Please add any special comments concerning po[enrially dangerous problems oo the back of this <br />sheet! 1~ <br />Inspected by: ~~/ ~c--t-~-y~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.