Laserfiche WebLink
seismograph will be installed at a locatiott to he approved by tfte Division, in <br />cooperation with the District. The seismograph will monitor each quarry <br />development and production blast. Seismograph records must be retained for at <br />]east 3 years and be available for inspection by the Division on demand. <br />Continued access to the Waste Water Treatment Plant by the Operator is <br />necessary for compliance with this permit condition; if the owner(s) of the Waste <br />Watcr Trcatmcnt Plant denies the Operator's access at any reasonable time for the <br />purpose of seismographic monitoring, the requirement to comply with this permit <br />condition shall be re-evaluated by the Division through submittal of a technical <br />revision by the Operator. <br />DATED this / ~~ day of ..a~~ , 2005. <br />FOR THE COLORADO MINED LAND RECLAMATION BOARD <br />Harry Jar rni~k, Chair, Mined Land <br />Reclamation Boazd <br />MMRR Board Order, M-2004-067 2I <br />2691 <br />