Laserfiche WebLink
f <br />• <br />obtained as needed from a relatively flat area east of the staging area. Soil at this location is <br />relatively deep (over 12 inches) and removing 4 inches of topsoil would provide enough material <br />to cover the terrace area with 2 inches of soil while leaving plenty of topsoil over the barrow <br />area. The barrow area will be reclaimed by disking and reseeding with the same seed mix as that <br />proposed for the terrace area. The terrace area will be reclaimed by spreading the top soil and <br />reseeding as described in the plan. <br />Comment 4, Exhibit F shows only Phase I mining area. <br />Response - As we discussed on the telephone, the plan is to provide individual maps for each of <br />the proposed phases of mining prior to the start of that phase. The operator is requesting that the <br />reclamation bond be initially only for Phase I, and would agree to a condition of the continuance <br />of the permit that maps and plans for Phase II and Phase III be required prior to disturbance of <br />those areas. <br />Please call if you have questions. <br />S,in1cenrely, <br />~~~ <br />1 s,S <br />II 4g`° <br />1~ i ~..a <br />David R. Smuin <br />HydroTerra-(970)242-4454 <br />