<br />Table 1. Cont. - Page 5
<br />
<br />Drill Hole
<br />Identification
<br />Northing
<br />Easting
<br />Elevation
<br />De th(ft) Hole
<br />Diameter Cement
<br />T pe Cement
<br />Amount(ft)
<br />287-E8 402,732 1,418,044 7,258 160 5.625 SAKRETE 4.19
<br />287-E 10 405,489 1,417,172 6,832 170 5.625 SAKRETE 4.28
<br />287-E 11 406,901 1,416,606 6,646 160 5.625 SAKRETE 4.45
<br />287-E12 406,215 1,417,974 6,824 220 5.625 SAKRETE 5.40
<br />287-E13 406,613 1,417,199 6,729 160 5.625 SAKRETE 5.06
<br />287-E17 402,375 1,418,093 7,317 160 5.625 SAKRETE 4.36
<br />287-E 18 404,305 1,417,796 7,042 180 5.625 SAKRETE 4.45
<br />287-E19 406,443 1,417,556 6,791 220 5.625 SAKRETE 4.71
<br />287-G1 406,032 1,434,655 7,289 250 5.625 SAKRETE 5.48
<br />287-G2 405,540 1;435,347 7,298 240 5.625 SAKRETE 8.42
<br />287-G3 405,225 1,436,007 7,229 210 5.625 SAKRETE 7.20
<br />287-G3CR 405,217 1,436,015 7,229 ]91.3 5.625 SAKRETE 7.20
<br />287-G4 404,500 1,436,403 7,251 200 5.625 SAKRETE 6.78
<br />287-GS 403,360 1,437,135 7,332 220 5.625 SAKRETE 8.25
<br />287-G6 404,020 1,435,640 7,429 200 5.625 SAKRETE 7.13
<br />287-G7 404,710 1,435,760 7,323 200 5.625 SAKRETE 6.61
<br />287-GS 404,705 1,434,987 7,419 210 5.625 SAKRETE 7.13
<br />287-G9 404,239 1,434,443 7,553 240 5.625 SAKRETE 5.88
<br />287-G9CR 404,252 1,434,443 7,553 218 5.625 SAKRETE 5.88
<br />287-H1 409,732 1,423,567 6,776 100 5.625 SAKRETE 1.86
<br />287-H2 410,117 1,423,506 6,745 110 5.625 SAKRETE 1.69
<br />287-H3 410,448 1,423,597 6,749 140 5.625 SAKRETE 1.86
<br />287-H4 410,373 1,422,943 6,708 120 5.625 SAKRETE 1.78
<br />287-HS 409,895 1,424,247 6,782 100 5.625 SAKRETE 1.51
<br />287-H6 409,503 1,424,566 6,808 70 5.625 SAKRETE 1.17
<br />287-H7 407,822 1,424,215 6,981 60 5.625 SAKRETE 2.21
<br />
|