Laserfiche WebLink
II. Exhibit "C" Mining Plan. <br />e. At the rate your operation is envisioned to operate, Tuesday thru Saturday, <br />unless your waste water dischazge permit listed under Exhibit "F" covers <br />the probable dischazge from the ponds, or these ponds aze sized enough to <br />allow retention, there is a very good tikely hood the system will discharge <br />during a precipitation event. As noted above, please explain how you <br />planned to retain all the water from your operation to make it a Zero <br />discharge system? <br />Answer: It is obvious from the remarks above, that until the Turquoise <br />Connection can obtain a Water Use and a Water Retention Permit, all <br />excess water above and beyond (storm water) the "purchased water level" <br />will have to be returned to the intermittent stream bed. This will be an "as <br />required Water Discharge Operation until further permits can be <br />obtained". <br />