My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61093
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:47 PM
Creation date
11/20/2007 7:01:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
7/15/2002
Doc Name
Letter with attached Condition No. 48
From
MCC
To
USFS
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR96
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN COAL COMPANY <br />WEST ELK MINE <br />HOT WORK PERMIT <br />DESCRIPTION OF WORK TO BE PERFORMED: <br />SUPERVISOR, COORDINATOR AND/OR SUPERINTENDENT TO CHECK ALL APPLICABLE ITEMS <br />8 EQUIPMENT REQUIRED: <br />8 20# FIRE EXTINGUISHER. FIVE (5) BAGS OF ROCK DUST MAV BE USED IN LIEU OI' EXTINGUISHER IN UNDERGROUND AREAS OF THE MINE. <br />^ ROCK DUST. ADDITIONAL NUMBER OF BAGS REQUIRED <br />^ CHARGED FIRE HOSE <br />^ SHOVEL <br />^ RAD10 COMMUNICATIONS WITH SURFACE OPERATORS <br />^ CALIBRATBD METHANE DETECTOR CAPABLE OF CONTINUOUS MONITORING <br />^ TIP CLEANERS <br />8 PERSONAL PROTECTIVE EQUIPMENT INCLUDING GLOVES. GOGGLES OR WELDING HOOD, LEATHERS, ETC. <br />^ WELDING SCREENS <br />^ ADDITIONAL FIRE WATCH <br />© AREA ABOVE, BELOW AND AROUND WORK SITE INSPECTED AND CLEARED OF HAZARDS <br />~ AREA CLEANED OF COMBUSTIBLES, FLAMMABLES AND COAL DUST <br />^ AREA ROCK DUSTED (10' RADIUS MINIMUM AND AT LEAST 1/4" DEEP) <br />^ ELECTRIC, PNEUMATIC, HYDRAULIC, MECHANICAL AND NUCLEAR EQUIPMENT LOCKED, TAGGED ANU ISOLATION VER IPIED <br />D EQUIPMENT BEING USED INSPECTED PRIOR TO USE <br />^ CONFINED SPACE EN'CRY REQUIREMENTS NECESSARY <br />^ ADDITIONAL POSITIVE VENTILATION REQUIRED <br />^ CONSPEC OPERATOR NOTIFIED OF ACTIVITY <br />^ THOROUGH METHANE CHECK BY MSHA QUALIFIED PERSON AND CONTINUOUS MONITORI NG THEREAI'TER (0.4%MAXJ <br />^ FULL TIME SUPERVISOR 70 BE PRESENT DURING ENTIRE HOT WORK PROCESS <br />D ADDITIONAL FIRE CHECK MADE BETWEEN 20 AND 60 MINUTES AFTER COMPLETION OF HOT WORK <br />^ OTHER -SPECIFY INSTRUCTIONS OR COMMENTS: <br /> <br /> <br />AUTHORIZATION TO DO WORK; <br />PERSON PERFORMING WORK DATE TIME <br />SUPERVISOR AND MONITOR DATE TIME <br />SHIFT COORDINATOR DATE TIME <br />THIRD LEVEL APPROVAL DATE TIME <br />ACKNOWLEDGMENT OF WORK COMPI,ETEU: <br />PERSON PERFORMING WORK DATE TIME <br />SUPERVISOR AND MONITOR DATE TIME <br />SHIFT COORDINATOR DATE TIME <br />THIRD LEVEL APPROVAL DATE TIME <br />
The URL can be used to link to this page
Your browser does not support the video tag.