Laserfiche WebLink
<br />EXHIBIT B <br />A. The topsoil will be removed to a minimum of 6"-8" and <br />stockpiled in the Eastern portion of the pit area as showr~ <br />on the map. Exhibit C. <br />B. Construction material will be removed with front end <br />loaders and dozers starting from the West entrance and woz•k- <br />ing East. Transportation to the project area is by truck. <br />Crusher will be operated on the site. <br />C. There will be no groundwater or surface water rights <br />involved in the operation. No water table is anticipated <br />to be encountered in the excavation. There will be no <br />water required for any aspect of the operation. <br />D. The actual area to be mined will cover less than 3 <br />acres, as shown on map. <br />E. The total effected area will cover approximately <br />3 acres, as shown on map. <br />F. Timetable of operations: As needed during summer <br />monthes. <br />G. The material to be mined will be sand and gravel <br />H. No more than 50,000 tons of material will be mined <br />including overburden. <br /> <br />