Laserfiche WebLink
III. 1. Archaeological Study <br />:. <br /> <br /> <br />2. Monitoring plan revised , <br />IV. 1. Hydraulic ,mine test=19b1_ <br />2. - Refilse~ disposal impoundment <br />3. Cut/fill volumes <br /> <br />4. Ditch A <br />An attempt has been made to <br />obtain this document, <br />however, Gibbs and Hill <br />performed the study and <br />have since gone out of <br />business. A further <br />attempt is being made <br />with BLM to obtain a copy <br />from their files. A copy <br />will be forwarded to <br />CMLRD. as soon as it <br />becomes available. <br />Exhibit 3.2-1 summarizes <br />the studies. <br />Section 4.6.3.3 <br />NCEC records do not contain <br />any information to answer <br />the question regarding <br />permitting, and there are <br />no longer any personnel <br />with NCEC who were <br />present at the time of <br />this test. However, the <br />area has been reclaimed, <br />inspected by CMRLD <br />personnel, and the bond <br />has been released. <br />Eliminated from mine plan <br />Section 4.2.5, NCEC commits <br />to resurvey of all cut <br />and fills and topsoil <br />stockpiles in order to <br />determine actual volumes <br />moved and presently <br />stored. This will occur <br />soon after resumption of <br />site operations., <br />Reference to ditch and <br />calculations haves been <br />removed <br />" ''~"5 :' `"New ,position 'of facsltities ' Revised -" . "~- `' <br />6. Topsoil Stockpile volumes NCEC commits to resurvey of <br />all topsoil stockpiles <br />once operations resume <br />,:_,Y~7uEG. _Y.Goal:~Ri.dge #1 '~_~6-4 ASC/1145/900912 <br />u <br />• <br /> <br />