My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE61060
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE61060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:45 PM
Creation date
11/20/2007 7:00:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
5/1/2003
Doc Name
Results of Laboratory Analysis of Cores and CHIP Samples
Section_Exhibit Name
Tab 06 Appendix 6-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACZ Laboratories, Inc. <br />Project: 133468 <br />ACZ Laboralodea. Inc. (ACZ) remWed 27 soil samples Iron Montgomery Watson on August 1B, 2D07. The samples were <br />received in good wndition. Upon receipt, the sample custwian removetl the samples from the ewlar, inspected Ne <br />wntents, end logged the samples into ACZ's wmputerized Laboratory Information Management System (LIMB). The <br />samples were assigned ACZ LIMS project number L33668. The wstodian verified the sample inlormetbn entered into the <br />Computer Bgeinst the Chain of custody (COC) torrrl5 and sample bodle labels. <br />All anayses were Derlormed wllhin EPA rewmmendetl holtlirq limes wlln the followirg exceptbn: <br />1. Due 1o a scheduling entl cepaciry wnfliq the 28 day Iwlding lime for Meroury was exceeded, Data slwuM ba qualified u <br />esematetl. No charges have been applied. <br />These samples ware analyzed la inorganic parameters. The indivitlual methods are referertcetl w DoM, the ACZ irnoice <br />and the anatyticel reports. Tae analyacel repons may wntain fwtwles regarding tlate quelificetion. In adtlilion the <br />lollavtng anomalies have been reported wiN This projecC <br />1. ACZ expederwed difficulties with Ne Fxchangeabte Swium Percent (ESP) analysis. At Nis time the anaysta has been <br />tlelete0 from Ne swpa of work for Nis project. <br />REPAp.02.11ACA1 <br />L33468: Page 2 of 71 <br />Montgomery Watson October O8, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.