<br />D.5 Operation Timetable <br />• D. 5.1 Project Phases <br />Using the mine maps, Figures D.5-1 to D.5-11, in conjunction with Table <br />D-4, the areal extent and time schedule can be determined. Two phases <br />are involved with a transition between phase one and two occurring about <br />seven months into year four. (See Exhibit E.5, reclamation timetable <br />discussion.) <br />D.5.2 Mining & Reclamation Sequence <br />Year 1 <br />Removal of vegetation and topsoil will preceed waste dump establishment <br />in the valley area. Figure D.5-2 depicts the dump and pit configurations <br />at the end of the first year. A topsoil storage area will be established <br />and seeded for erosion control. Within the first year the road to JD- <br />• 7 underground facility will be relocated and the support buildings <br />constructed. Only overburden will have been removed from the pit at <br />this time. <br />Reclamation test plots will be initiated in the fall, located on the <br />western portion of the overburden and the topsoil stockpile. These test <br />plot areas will be topsoil-capped overburden and pit benches. The <br />establishment of general experimental parameters and the logistics of <br />the reclamation process will be first year objectives. <br />Year 2 <br />The spoil area has expanded after vegetation removal and topsoiling as <br />per Table E.5-1 and the second year mine map (Figure D.5-3). Some ore <br />bearing zones may be encountered with pit expansion but the primary <br />activity will still be overburden removal. <br />D-4 <br />