Laserfiche WebLink
4. Indicate the projected amount from each of the sources of water to supply <br />the project water requirements for the mining operation and reclamation. <br />Please refer to the attached Temporary Substitute Supply Plan, which has been submitted <br />to the State Engineer's Office. The TSSP addresses the source and amount of water from <br />each water right associated with the property and how each of those water rights will be <br />utilized in the mining operation. <br />5. Affirm that the Applicant has acquired or applied for a National Pollutant <br />Discharge Elimination System (NPDES) permit from the Water Quality Control <br />Division at the Colorado Department of Health and Environmental Services. <br />The applicant will apply for a NPDES Permit from the Water Quality Control Division at <br />the Colorado Department of Public Health and Environment. Hall-Irwin will forward a <br />copy of the permit upon request. <br />Hall-Irwin Corporation Page 23 of 35 <br />MLRB 112 Permit Application <br />