My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-14_PERMIT FILE - M2003001
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2003001
>
2003-05-14_PERMIT FILE - M2003001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 11:07:22 AM
Creation date
11/20/2007 6:59:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Permit File
Doc Date
5/14/2003
Doc Name
Permit Application
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Schedule <br />Phase Time Frame <br /> Mining /Reclamation <br />Phase 1 1 year <br />Phase 2 2 years <br />Phase 3 3.5 years <br />Phase 4 3.5 yeazs <br />Phase 5 2.5 years <br />Phase 6 2.5 years <br />Upon final mining of the last Phase, Hall-Irwin estimates approximately 3-5 yeazs <br />to reclaim the entire site and establish vegetation. <br />2. A description of the size and location of each area to be reclaimed <br />during each phase; and <br />Refer to the Reclamation Plan Map in Exhibit F for the size and location of each <br />phase. <br />3. An outline of the sequence in which each stage or phase of <br />reclamation will be carried out. <br />The sequence of reclamation will include regrading of mined sites, replacement of <br />6" of topsoil and seeding during the appropriate season to assure adequate <br />moisture for germination and weed control and to assure that grasses can establish. <br />Additional plantings will be installed during final reclamation. <br />Hall-Irwin Corporation Page 20 of 35 <br />MLRB 112 Permit Application <br />