Laserfiche WebLink
Mined Land Reclamation August 16, 1985 Page 2 <br />ti <br />S <br />ta <br />on X _y Z <br />U-13~. 404,387.701 1,443,503.794 6114.216 <br />U-14 ,4Q4~479,380 ,1.,443,610.213 .6090.808 <br />U-15 '404;474:847 1,443,895.662 6107.753 <br /> <br />Deviation' y. r. <br />frbm the 1984 monitoring is: <br />':Station ~Horiz. Vert. <br />U-13 .1:018 3:196 <br />U-14 0.61 2.738 <br />U-15 1.008 3.2e3 <br />Morlitoring 'of the four stations on Bear No. 3 resulted in the <br />fol'l awincj: <br />Station ~X Y Z <br />- ., <br />U=16 404',057,568 1,441,800.000 ,6267.62'4 <br />U-17 404,.311.880 .1,442,097x444 6.164,209 <br />U=18 404,313.783 1,442,360.072 6158.625 <br />{:I-14 404,403.852 1,442,179.523 Disturbed <br />.~ Deviation from the 1984 monitoring is; <br />Station Hori'i. Vert. <br />U-ib 0.3-a4 -0.086 <br />U=17 0.386 -0.+51 <br />U-]8 Q,. 277 +0.335: <br />U-19 0.44 Not Applicable <br />~'~ y: ~.. <br />The rang.e5 shown appear reasonable since different equipment <br />and trevl~ were used this year, <br />Station U=19 was disturbed: During .t,he; winter mq(1,ttYS;~ show <br />covered~U-19. When the road was plowed, snowy.-a~ud'.and'de6~s <br />was accidentally pushed onto U-]9, Anew,-skation-U-~19;wilY ` <br />be estatilished~ arld used for; future monitoring, •.It will be` a <br />3-inch steel pipe, 7-feet long, 1}urigd, 3'6" in the ground. ' <br />It wi=ll be'equip~ed with a 4-inch square top containing a 5/8- <br />inch` bolt:- <br />~~ / <br />Ci" /` <br />• E. LeRoy Black <br />cc: Bear Coal Company <br />ACZ; ' I•nt': ' <br />