Laserfiche WebLink
<br /> <br />f~'. Fai=a .;e providN the average. Fi~u.~l distance for topsoi.] <br />ad overbi-irden repi.ar..ement:. <br />U. Please i.nclud~-~ aa.l costs +or scedt~ed prepar.:rl-ion <br />prior' to seeding. <br />[. I'aea=e I:~r-ovide cost data for- oht,aining sui~+icicnt <br />i.rri.g;ati.on egi_iipmt=n t„ water and labor to irrigate= <br />tha= Iia~y meadow fnr i:.he pe.r-iod o+ timra c~.itlined i.n <br />the plan. <br />F. F='lea~se pr-o/:icae r.:nst. data for =_shrub e,r-~d tree, !seedling <br />I:1 Y'GCUY'eln C'nt, plaan t. i. rub ,and ent.ahaishrnent. <br />A. Costs are relatively ine:spensive since there is <br />already a screening operation on site. <br />1. Stockpiling the unscreened plant-growth <br />medium X0.70/cu. yd. <br />2. Transporting the unscreened plant-growth <br />medium to the screen before replacement/ <br />stockpiling for future use 0.20/cu. yd. <br />3. Screening the unscreened plant-growth <br />medium 0.15/cu. yd. <br />Total ~I.OSIcu. yd. <br /> <br />B. Cost for ripping compacted areas. <br />1. Using equipment on site at <br />an average cost of $40/ <br />grader hr (grader with <br />ripper on back X40/acre <br />C. Average haul distance will be 1/2 mile. This figure <br />is applicable to both topsoil/overburden (plant- <br />growth medium). <br />D. Seed bed preparation costs are: <br />1. Ripping (scraper) (S40/acre) <br />2. Screening 01.05/cu. yd.)* <br />3. Hauling/handling after screening <br />(50.35/cu. yd.) <br />4. Leveling after dumping (grading) <br />Total/Acre <br />This figure is actually part of <br />the mining process in that the <br />rack recovered may 6e part of the <br />material being mined and sold. <br /># 40.00 <br />1,270.50 <br />423.50 <br />181.50 <br />51,915.50 <br />i] <br />