Laserfiche WebLink
<br />10. Primary future <br />(Post-mining) <br />land use <br />(check one): <br />11. Primary rp esent <br />land use <br />(check one): <br />12. Method of Mlning <br />Cropland(CR) <br />y~ Rangeland(RL) <br />Residential(RS) <br />_ Developed Water <br />Cropland(CR) <br />xx Rangeland(RL) <br />Resldential(RS) <br />_ Developed Water <br />-3- <br /> <br />_ Pastureland(PL) <br />_ Forestry(FR) <br />Recreation(RC) <br />Resources(WR) <br />_ Pastureland(PL) <br />_ Forestry(FR) <br />Recreation(RC) <br />Resources(WR) <br />_ General Agriculture(GA) <br />_ Wildlife Habitat(WL) <br />Industrial/Commerclal(IC) <br />_ Solid Waste Disposal(WD) <br />_ General Agrlculture(GA) <br />_ Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Quarry (QR) _ Solution (SO) <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br />Lowering the bank of the river thrnnah ucP of front anA <br />loader and truck <br />13. On Site Processing: _ Solution (SO> _ Chemical (CH) _ Thermal (TH) <br />_ Heap Leach (HL) _ Vat Leach (VL) <br />N/A <br />14. Application Fee: <br />The application fee for quarry mining is $2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />is 53,100. <br />If none of these methods or processes are to be included 1n the operation then the <br />application fee is $1,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2>>. <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is Issued. <br />