Laserfiche WebLink
Table 1. Facilities Summary <br />Description Potential Applicable <br /> Pollutants BMP's <br />Waste rock facility Sediment & dissolved solids Sediment control structure <br />(WASTE ROCK AREA C) <br />RECLAIMED 1 <br />Mine (open pit) Sediment & dissolved solids Inactive <br />(EAST PIT - backfilled) <br />RECLAIMED (1) <br />Topsoil stockpile, (3) Sediment due to natural Perimeter ditches, berms <br /> erosion & Energy dissi ation, (2) <br />Mine (open pit) Sediment & dissolved solids Zero discharge - (West Pit <br />(WEST PIT-backfilled) diversions stem) <br />Trapezoidal diversion ditch Ditch erosion-sediment Energy dissipation, (2) <br />Haul Road Sediment due to natural Energy dissipation, (2) <br /> erosion <br />Waste rock facility Sediment Sediment control <br />(WASTE ROCK AREA B) structure/continuous <br />RECLAIMED (1 reclaim <br />Old heap leach Sediment due to natural Inactive <br />RECLAIMED (1) erosion <br />Undisturbed natural sage & scrub Sediment due to natural None required <br />land erosion <br />Waste rock facility Sediment Sediment control <br />(Waste Rock Area D) structure/continuous <br />RECLAIMED 1) Reclaim <br />Trapezoidal diversion channel Sediment transport Energy dissipation (2), <br />(ripra lined) Zero discharge <br />Tailing disposal area Sediment Zero discharge <br />Mill facilities Sediment Zero discharge, Inactive <br />Ready Line (4) Fuels, oils, grease, & Pre-treatment & good <br /> sediment housekee in <br />Waste rock facility -Base of Sediment & dissolved solids Sediment control structure <br />revious ore stoc ile <br />Waste rock facility Sediment Sediment control <br />(Waste Rock Area South) Structure/continuous <br />RECLAIMED (1) Reclaim <br />(1) Areas have been graded, growth medium applied, and revegetated. <br />(2) Hay bails, sediment fences, rock check dams, stilling basins, etc. <br />(3) Runoff from topsoil stockpile shall be controlled by using perimeter ditches and berms to collect <br />sediment. <br />(4) Runoff from ready line, truck maintenance will be pre-treated by retaining the first inch of runoff to <br />reduce sediment load and remove volatile constituents. <br />Battle Mounmin Resources, /nc. Telesto Solutions, lnc. <br />sanluisnormvnre.mnnrrgemenrplaaJx 29 May j, 2002 <br />