Laserfiche WebLink
<br />' Section 2.03.8 Permit Term Information <br />(1) The anticipated or actual starting and termination <br />date of each phase of the surface mining activities and <br />' the anticipated number of acres of land to be affected <br />for each phase of mining and over the total life of the permit. <br />Not Applicable. <br /> (2) The anticipated <br />t <br />f <br />h <br />d <br />h or actual starting date <br />f th <br />d <br />d <br />i <br />i and termination <br />ti <br />iti <br /> a <br />e o <br />eac <br />ase o <br />p e un <br />ergroun <br />m <br />n <br />ng ac <br />v <br />es <br /> and the anticipated number of acres of surfac e lands to <br /> be affected, and the horizontal and vertical extent of <br /> proposed underground mine workings, for each phase of <br /> mining and over tre total life of the permit. <br />The anticipated number of acres of surface lands to be <br />disturbed by the Bear Mine, is 19.3 acres. Refer to <br />the Existing Land Use Map, 2.04.3(2)(a). Rear Coal <br />Company, Inc. does not anticipate any future disturbances <br />of the surface lands. <br />The Operation Plan Map, 2.05.2(1)-1, illustrates the mining <br />' projected for the Bear Mine within the permit term. <br />As fully described in the Operation Plan. Permit Area, <br />' Section 2.05.3, the Bear Mine is planning to mine <br />200,000 to 250,000 tons per year with a horizontal extent <br />' of 36 to 42 acres per year. <br />' (3) Surface or underground mining activities in excess <br />of 5 years. <br />' Plans are not complete, The Division will be contacted <br />as soon as plans are completed. <br />1 <br />1 <br />20 <br />