Laserfiche WebLink
<br /> INFORMATION CATEGORY <br /> <br /> 2.05.3 Overburden <br />' (6) <br /> 2.05.3 Coal Handling Structures <br /> (7) <br /> 2.05.3 Coal Processing Waste <br />' (8) and Non-Coal Processing <br /> Waste <br />' <br /> 2.05.3 Underground Development <br /> (9) Waste <br />' 2.05.3 Return of Coal Processing <br /> (10) Waste to Abandoned Workings <br /> <br />' <br /> 2.05.4 Reclamation Plan: <br /> <br /> 2.05.4 Timetables <br /> (1) (a) <br /> 2.05.9 Reclamation Cost Estimates <br />' (2) (b) <br /> 2.05.9 BackfilZing and Grading <br />' (2) (c) <br /> <br /> 2.05.4 Topsoil (Redistribution) <br /> (2) (d) <br />' 2.05.4 Revegetation <br /> (2) (e) <br />1 <br /> 2.05.4 DisFnsal of Debris, Acid- <br /> (2)(f) Forming and Toxic-Forming <br />, Materials <br />' 2.05.9 Sealing or Managing Mine <br /> (2)(g) Openings, Exploration <br /> Holes, Other Boreholes or <br />' Wells <br /> <br /> <br />NARRATIVE <br />65 <br />66 <br />66 <br />67 <br />68 <br />68 <br />7 <br />70 <br />71 <br />71 <br />75 <br />75 <br />-6- <br />in Appli ca tiOn <br />*Post-mining topography <br />2.05.4(2)(c) <br />Final contours <br />2.05.4 (2) (c) <br />